سلام وقتتون بخیر، ارسال به شهرستان هم دارید؟چه مدت زمان میبره تا ارسال شه؟

GPU enablement kit WARNING: To scale back the potential risk of individual personal injury, electrical shock, or damage to the devices, remove the facility twine to eliminate electrical power with the server. Pressing the facility On/Standby button doesn't shut off process ability completely. Portions of the facility source and many internal circuitry stay Energetic right until AC ability is eliminated. Web page eighty three Install the GPU retention clips onto the air baffle. Remove the typical heatsinks. Set up the large-performance heatsinks. Components options installation eighty three... Web site 84 Install the air baffle.

To improve server availability, the server supports the following AMP modes: • State-of-the-art ECC—Gives as much as 4-bit error correction. This mode may be the default choice for this server.

Mirrored memory configuration Mirroring presents defense against uncorrected memory mistakes that will or else result in server downtime.

Configure VCRM to update the repository routinely with Web downloads of the latest software package and firmware from Hewlett Packard Business • VCA compares put in software versions within the node with updates readily available within the VCRM managed repository. Administrators configure VCA to issue into a repository managed by VCRM. To learn more about Variation Manage equipment, see the subsequent files around the Hewlett Packard Business Site (): •.

Battery replacement If the server now not mechanically displays the proper day and time, you may have to exchange the battery that provides electrical power to the actual-time clock.

Critical: When applying cable administration arm elements, you'll want to depart sufficient slack in Every of the here cables to prevent harm to the cables once the server is prolonged through the rack.

ذخیره نام، ایمیل و وبسایت من در مرورگر برای زمانی که دوباره دیدگاهی می‌نویسم.

It is really many characteristics to pack into this sort of a little piece of apparatus, but HP's Proliant line of servers is commonly the ideal offering line of kit each year, so these options are no surprise. Several businesses assist their components and also HP.

Lengthen the server in the rack. Following accomplishing the installation or maintenance technique, slide the server back into your rack, then push the server firmly in to the rack to protected it in position.

Shop products and solutions from tiny small business brands sold in Amazon’s retailer. Find more details on the little firms partnering with Amazon and Amazon’s motivation to empowering them. Find out more

نرم افزارهای ترافیک بالا که کاربران زیادی دارند را به خوبی پشتیبانی می کند.

When installing more than one server, you might require to employ extra electric power distribution devices to safely and securely present power to all devices. Web page 38: Rack Warnings

WARNING: The pc is made up of an interior lithium manganese dioxide, a vanadium pentoxide, or an alkaline battery pack. A threat of fireplace and burns exists When the battery pack will not be correctly managed. Page one hundred ninety: Guarantee And Regulatory Information

Electric power fault LEDs The subsequent table gives a summary of energy fault LEDs, along with the subsystems which are affected.